Squeezed in a couple hours after work tonight before it got dark. Finished the basic framing, fixed one skew-iff corner and then cut all the supporting studs. I still have to screw the studs in, which will take a while. I also have one out-of-whack piece to fix up which I will probably have to disassemble and rebuild. I think that all of that will probably take me about 3-4 hours.
Then I have the "tricky bits" to do
- a wall with a backsplash behind the long/grill wall (this isn't too bad)
- the counter/overhang
- the raised bar on the side opposite the grill
- the small overhang to the right of the grill
- the footrests under the raised bar and by the small overhang
- the framing for the grill/burner and access doors
Those are gonna take some time, so I'm not sure when I will be done framing. It's meant to rain Tues/Wed so I have shut the site down and weatherproofed! Hopefully I can get some time in Thur/Fri and then have a solid weekend and get thru most, if not all of the framing.
No comments:
Post a Comment